IRAN GABBAY PROJECT

Project is to consume maximum available FSI establish an interesting design solution representing contemporary architecturalonge to develop an iconic structure

About Project

Facility is considered to be primarily for the client whereas the floors not occupied by the client will be leased out till its future requirements.

Conclusion